Sunday, March 1, 2020

Stitching and DeStashing--Week 9, 2020

The Saturday Sampler blocks that I showed in last Sunday's post have since been turned into a completed quilt top, which I shared on Friday. Finishing that top used 2.25 yard for the sashing, setting triangles and borders. It ended up becoming a bright, cheery little quilt, and it's a good size for a child.


Saturday Sampler quilt top
50" x 63"


2020 STASH TOTALS
Used last week:                            2.25 yards
Used year to date:                        9.25 yards
Added last week:                            0.0 yards
Added year to date:                        0.0 yards
Net used year to date               9.25 yards



Kate's 15 Minutes to Stitch challenge at Life in Pieces has us tracking how many days each week we get in at least 15 minutes of quilting time. I spent plenty of time last week finishing the Saturday Sampler quilt top, but missed one day at the end of the week.

15 Minute Challenge:  
2/16 - 2/22                6 of 7 days
2020 Total               58 of 60 days


Check out more stash reports at quiltpaintcreate and join the 15 Minutes to Stitch challenge at Life in Pieces. Many thanks to Donna and to Kate for continuing to host these link-ups!

Happy quilting everyone!

Julie in GA

4 comments:

  1. Congrats on all the stash busting so far this year! You are doing well on the nothing in column too. Sorry you ended up missing a day last week, you must have had one of THOSE days. Hope this week goes smoother.

    ReplyDelete
  2. What a lovely finish. Such bright colours, sure to make anyones day a little brighter.

    ReplyDelete

Related Posts Plugin for WordPress, Blogger...