Finally, the work schedule is getting better, but it seems that life outside of work is getting harder. I was very sick for three days this past week and am waiting for test results to find out exactly what is going on. Somehow I still managed to spend at least 15 minutes quilting on 6 out of 7 days, mostly doing hand work, and that is a much better result than I would have expected.
15 Minute Challenge:
1/20 - 1/26 6 of 7 days
2019 Total 23 of 26 days
No new fabric was added to the stash yet again, and I used 1/2 yard for two different Rainbow Scrap Challenge projects, the Framed Crumb Star and the Stair Steps blocks. Here is another zigzag layout possibility for the Stair Steps blocks.
2019 STASH TOTALS
Used last week: .50 yards
Used year to date: 2.50 yards
Added last week: 0.0 yards
Added last week: 0.0 yards
Added year to date: 0.0 yards
Net used year to date: 2.50 yards
Net used year to date: 2.50 yards
Check out more stash reports at quiltpaintcreate and join the 15 Minutes to Stitch challenge at Life in Pieces.
Happy quilting everyone!
Julie in GA
I'm sorry you aren't feeling well. Hope the doctors can figure out the problem so you can get some help. Your stair steps are so pretty!
ReplyDeleteSorry to hear you have been under the weather. Hopefully the Dr's can figure it out. Love the Stair Steps!
ReplyDeleteThose log cabin blocks are so pretty. I love the colors too.
ReplyDeleteHope you're feeling better soon. Love your stair step blocks. Is this a pattern you can share or direct me to where I can find it? Would love to try this one. bfiresheets@bellsouth.net
ReplyDeleteHope you are feeling much better, absolutely no fun being ill. Maybe it's your body just saying "enough" after your mad house schedule leading up to the holidays. You still did well to find time to stitch most days.
ReplyDelete