Because we rented a house at the beach, I was able to take a sewing machine along and spent some of my time quilting. Most of that was cutting pieces for Bonnie Hunter's Frolic mystery, plus I did a little bit of stitching too. I also finished a couple more Orange Peel blocks during the drives down and back.
Kate's 15 Minutes to Stitch challenge at Life in Pieces has us tracking how many days each week we get in at least 15 minutes of quilting time. Because I was able to quilt at the beach, my total for the week was 7 for 7. I will post my final numbers for the year next week.
15 Minute Challenge:
12/22 - 12/28 7 of 7 days
2019 Total 342 of 362 days
Before we left on our trip, I finished joining all the blocks together from Alycia's 2019 Winter Quilt-Along. I haven't been able to get any complete photos of the finished top yet, but here is the center of the quilt. Yardage used for this quilt was 5 yards. No new fabric added last week.
2019 STASH TOTALS
Used last week: 5.0 yards
Used year to date: 63.0 yards
Added last week: 0.0 yards
Added year to date: 71.75 yards
Added last week: 0.0 yards
Added year to date: 71.75 yards
Net added year to date: 8.75 yards
I will update my final totals for 2019 next week. There's still a chance I might be able to use some more fabric in the remaining 2+ days!
Check out more stash reports at quiltpaintcreate and join the 15 Minutes to Stitch challenge at Life in Pieces.
Happy quilting everyone!
Julie in GA